EasyManua.ls Logo

Lenze E82ZAFPC201 - Before Switching On

Lenze E82ZAFPC201
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
Before switching on
6
l 26
EDS82ZAFPC201 EN 4.0
6 Commissioning
During commissioning, system−dependent data as e.g. motor parameters, operating
parameters, responses and parameters for fieldbus communication are selected for the
controller.
In Lenze devices, this is done via codes. The codes are stored in numerically ascending order
in the Lenze controllers and in the plugged−in communication/function modules.
In addition to these configuration codes, there are codes for diagnosing and monitoring
the bus devices.
6.1 Before switching on
( Stop!
Before switching on the standard device with the function module for the first
time, check...
ƒ the entire wiring for completeness, short circuit, and earth fault.
ƒ whether the integrated bus terminating resistor is activated at the first and
last physical node ( 33).

Table of Contents

Related product manuals