Chapter 3 Electrical Installation 19
Liebert NXC 30kVA And 40kVA UPS User Manual
Figure 3-3 Power cables wiring route (top cable access)
Left top cover
Step 1: Remove this left top cover, lead
cables into cabinet, and route cables
along left side panel to cabinet base
Step 2: Lead cables out from U type hole at
the bottom of power distribution frame, and
connect them to corresponding terminals