EasyManua.ls Logo

Lighting Controls Blue Box LT Series - Page 102

Lighting Controls Blue Box LT Series
148 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LCDBBSSU&CG03Sept08
LIGHTING CONTROL & DESIGN
905AllenAve•Glendale,CA91201•Support800-345-4448•www.lightingcontrols.com
Bus Checker Card
Bus Checker Card
Bus Checker Card
Data/Power Jumper
Data/Power Jumper
Data/Power Jumper
BUS SPLITTING TECHNIqUE
!
Note:To speed up troubleshooting when readings are
less than 200 on the Continuity or Short-Circuit test,
refer to the “Bus Length Chart” earlier in this document
before splitting the bus; this can provide an approximate
distance to a shorted pair or extra terminator from the
test point.
On the middle device of the bus, disconnect one Cat. 1.
5 cable to create two smaller “half-buses”.
Test each “half-bus” to find the side with the out-of-2.
range values.
Repeat steps 1 & 2 on the out-of-range “half-bus, to 3.
create another “half-bus” until the cable, crimp or device
creating the out of range measurements is located.
The idea is to split a bus in half and then half again over and
over until the bad area has been located. It is OK to visually
inspect each cable, crimp or device to detect the problem.
HARDWARE ACTIvATION TROUBLESHOOTING
(Continued)

Table of Contents