RAIL ASSEMBLY
Start assembling the sawmill by mounting the rail. The sections of rail are place under the saw head in the
pallet. The assembly involves heavy lifting and requires two people.
WARNING!
Heavy lifting. Risk of injury.
WARNING!
Risk of crush injuries.
IMPORTANT
Two people are always required to help with heavy lifting.
WEAR PROTECTIVE GLOVES
Always wear protective gloves and handle the motor carefully when placed on the motor shelf.
EXTRA EQUIPMENT
There are accessories for this machine that may affect the sequence of assembly in this manual. Read through
the assembly instructions in the various manuals before starting work to get an overview of the different
procedures.
Follow the steps of assembly carefully and use an ergonomically correct work position while working.
Work on level ground, as this will facilitate when adjusting the rails.
Read through all the assembly instructions before starting assembly, then follow the instructions
step by step as you work.
USER MANUAL
19