EasyManua.ls Logo

LS Industrial Systems XBC-E Series - Page 516

LS Industrial Systems XBC-E Series
542 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 10 Maintenance
XBC E-Type Main Unit 10-14 Ver. 1
Output circuit troubles and corrective actions (continued).
Condition
Cause
Corrective actions
Latency in
the de-
energizing
of the
switched
output
device
The characteristics of solid state switching
devices can lead to a delayed Off time to the
inductive/resistive load.
Use an interposing relay between the
module output and the controlled load.
Consider using a transient absorbing/clamping
device
across the load to lengthen the life of
the relay contacts.
Module
output
transistor
damaged
The inrush current to the load is high enough
to permanently damage the output transistor.
Use an interposing relay between the
module output and the controlled load.
Consider using a transient absorbing/clamping
device across the load to lengthen the life of
the relay contacts
Output
Load
Output
E1
Output
Load
E
Off current
Output
Load

Table of Contents

Related product manuals