5.1 First start-up
After switching on the water and power supply, the system is ready for operation. First the supply line (incl. lter
unit) is vented. To ush the lines, open the ball valves at the line ends. If necessary, a hose can be pushed on the
outlet of the ball valve to drain off the water. Only after thorough ushing of all lines, the installation of high pressure
nozzles can follow (see chapter 3.5.7 “Installation of nozzles” or chapter 3.5.8 “FlexClamp system”). After the
assembly of all nozzles, the lines are completely ushed again for approx. 2 minutes with the ball valves open. After
the ball valves have been closed again, the assembly is completed.
A ushing process can be started on the LUBING Touch Controller as a special function. Since the nominal
pressure cannot be reached during ushing, the pressure switch is not checked for this special function. Flushing
also vents the lines. After sufcient ushing, the ball valves are closed again and the ushing process must be
terminated at the Touch Controller.
5.2 Temporary shut-down and restarting
If the system is not used (e.g. during the winter months) or there is a risk of frost, the water should be drained from
the pipes. To do this, open the ball valves at the end of the line and loosen the hydraulic hose of the pump unit.
The water can be blown out with compressed air.
The lines must be thoroughly ushed and vented before each restart. Only then close the ball valves at the line
ends.
It is recommended to check the correct function of all nozzles during restart of the system. If nozzles are blocked
or the spray pattern is not okay, clean or replace the nozzles.
5.3 Water quality
Lubing recommends every operator of the climate system to operate the system only with drinking water quality
and in conjunction with the supplied lter unit. In accordance with the limit values of the Italian Drinking Water
Regulations, the following values should not be exceeded:
With these values you achieve a long service life of the system, especially of the nozzles. If these values cannot be
achieved, a water treatment system should be installed upstream in case of problems.
5.4 Disinfection/medication
Spraying additives dissolved in water is basically possible with the LUBING Top climate system. But the following
points have to be considered:
NOTE
The ball valves must be closed during the ushing process, otherwise air will enter the lines again.
NOTE
If there is a risk of frost or longer downtimes, the pump unit and the lter unit also have to be drained.
NOTE
Make sure that the pipes are thoroughly ushed regularly, but at the latest before the start of a new
cooling period.
DESCRIPTION UNIT LIMITED VALUE
PH-Value mg/l 6,5 - 9,5
Hardness °F 15-50
Sulphate mg/l 250
Nitrate mg/l 50
Chloride mg/l 250
Iron mg/l 0,2
lubingsystem.com
lubingsystem.com
lubingsystem.com
lubingsystem.com
lubingsystem.com
lubingsystem.com
lubingsystem.com
lubingsystem.com
lubingsystem.com
lubingsystem.com
lubingsystem.com
lubingsystem.com
lubingsystem.com
lubingsystem.com
lubingsystem.com
lubingsystem.com
lubingsystem.com
lubingsystem.com
lubingsystem.com
lubingsystem.com
c
lubingsystem.com
lubingsystem.com