Lucent Technologies Lineage
®
2000 50A -48V 364A-3 SR Series Rectifier
Issue 6 January 1997 Installation 5 - 1
5 Installation
Introduction This section covers the rectifier shelf assembly (RSA)
installation and removal, rectifier installation and removal, and
initial start up and check procedures for the 364A3 rectifiers. If
the RSA is purchased as part of an ECS system, the RSA will be
factory installed in the ECS frame.
Safety Only persons trained and experienced in the installation of
telecommunications power equipment should install the
rectifiers and associated RSAs.
It is recommended that the commercial ac power be wired by a
qualified electrician.
Please review Section 4, Safety, before installing or maintaining
this equipment.
Installation
Tools and Test
Equipment
The following tools and test equipment are required for
installation and test of the rectifiers.
• Common electrician’s hand tools
• Common mechanic’s hand tools, including a 20 foot-pound
torque wrench and a set of deep english sockets
• Insulated 3/16-inch Allen wrench key (provided with each
ECS frame)
• Crimp tools (See Figure 5-2 for details)
• Fluke 8060A Digital Multimeter (DMM) or equivalent. The
accuracy of an equivalent meter should be +0.05% on the dc
scale.