GB
23
2.4 Hose installation of the operating unit
Assembly of the operating unit at the hose
Mounting steps:
1. Remove the batteries out of
the operating unit
2. Remove the cap and release
the screws
3. Carefully lift the operating unit,
paying attention to cable
length!
4. Release the plug
5. Remove the cap from the
intermediate plate
6. Screw the hose clamps under
the intermediate plate and
mount the cap
7. Screw the operating unit onto
the intermediate plate and
mount the cap
8. Press the hose into the hose
clamps. Snap the clamp into
place
9. Connect the ribbon cable to
the plug in the protection cap
10. Screw the protection cap onto
the flow meter and mount the
cap
11. Connect the operating unit and
protection cap using the data
line
12. Insert the batteries
C. Operating unit