EasyManua.ls Logo

Lutz ST - Battery Replacement and Maintenance

Default Icon
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GB
42
4. Maintenance and servicing
4.1 Changing the batteries
The flow meter is running on 3 alkaline manganese batteries LR 1, SIZE N. The LCD display indicates the approaching
end of the battery life with the word „BATT“ 18.
+ If the „BATT“ display flashes, the batteries must be changed within 1-2 weeks.
Once the „BATT“ display is indicated permanently, the batteries require immediate changing.
Danger!
When changing the batteries in explosion hazard areas danger of explosion occurs!
Blast wave: Flying parts can cause death.
Change of battery only outside of hazardous location with appropriate tools. Only following battery
types are approved:
VARTA High Energy; No. 4901; Size LR1
VARTA Electronic Alkaline; No. 4001; LR1; LADY; N; AM5
DURACELL ALKALINE; SIZE N; MN9100; LR1
Energizer Alkaline; E90; LR1; N
Mounting steps:
1. Unscrew the battery compartment lid 20
2. Remove the batteries
3. Insert new batteries, checking for correct polarity 19
4. Screw the battery compartment lid 20
5. Press key RESET
+ If the flow meter is not used for longer periods, the batteries must be removed!
C. Operating unit

Table of Contents