87
Installation, commissioning
Introduction
7 Installation, commissioning
7.1 Introduction
To install/commission the machine, also observe:
Qualification of personnel.
See chapter "7.1.1 Qualification of personnel".
The safety messages.
See chapter "7.3.1 Safety messages".
The safety instructions in the separate installation and commissioning
instructions.
See separate installation and commissioning instructions.
The protective devices.
See chapter "4.4.8 Checklist for protective devices".
7.1.1 Qualification of personnel
This table lists the necessary qualification of the personnel related to "Set
up and commissioning" of the machine.
Specially trained
personnel
Instructed operating
personnel
Instructed personnel with
specialized training
(mechanical/ electrical
engineering)
Set-up --X
Electrical
connections
--X
Stationary mains
connection
--X
Commissioning --X
Table 24: Qualification of personnel; Set-up, commissioning
Legend: X permitted, - not permitted