94
Rewinder RW500
Installation, commissioning
Commissioning process
7.3.6 Checking the protective conductor connections
Check that all protective conductor connections that were disconnected for
transport are reconnected correctly.
Procedure:
Check this by visual inspection.
7.4 Commissioning process
• After the stationary mains connection, the machine must be commis-
sioned.
• Separate installation and commissioning instructions are required for
this.
7.5 Conducting a final check of the protective devices
After commissioning the machine, be absolutely certain to carry out a final
check of the protective devices.
Procedure:
Check that all covers and protective devices are installed and fully
functional.
For this purpose, use the checklist for the protective devices.
See chapter "4.4.8 Checklist for protective devices".
WARNING!
Disconnected protective conductor connections.
Non-observance could result in serious injury or death.
Reconnect all protective conductor connections that were disconnected
for transport.
Only have the machine commissioned by MBO Service or by a customer
service technician authorized by MBO.