|
13
VIKING / VIKING COMBI
Rev. 2.0 (1.8.2017)
Operating instructions
4.1.4. Quarterly
1. Do the checking when the kettle is
empty.
2. Check the water level of the steam
generator (electrically heated models).
3. Switch the kettle on by turning the
power regulator to position 6.
4. Heat up the kettle until the pressure
gauge shows 1,0 bar pressure.
5. Open the safety valve by cautiously
lifting the relief lever (1) upwards.
Now the safety valve should open
and the pressure gauge should in-
dicate a lower value.
Beware of hot steam.
Some models
1. Do the checking when the kettle is
empty.
2. Check the water level of the steam
generator (electrically heated models).
3. Switch the kettle on by turning the
power regulator to position 6.
4. Heat up the kettle until the pressure
gauge shows 1,0 bar pressure.
5. Open the safety valve by cautious-
ly turning the relief knob (1) in the
direction of the arrow on the nob.
Now the safety valve should open
and the pressure gauge should in-
dicate a lower value.
Beware of hot steam.
4.1.5. Yearly
• It is advisable to have the unit checked once a year by qualifi ed personnel. Preventive checking is the
best guarantee for operational reliability and saves breakdown costs.
• Depending on the hardness of water, descaling must be done by qualifi ed personnel. If the kettle is
equipped with the cooling function and it has been used often descaling should be done more than
once a year. When doing the fi rst descaling the technician can estimate when the following descaling
must be done.
Fill out the form “Notes on service work” with information on service work which has been done accord-
ing to the instructions. Maintenance work ensures the safe and reliable function of the kettle.
Check that the safety valve functions correctly: