|
37
VIKING 4G E, S
Rev. 1.0 (29.1.2020)
Installation
300 and 400 liter kettles
The 300 and 400 liter kettles are delivered pre-mounted on the free standing frame.
• Lift the kettle one side at the time and place planks under the feet of the free standing frames feet in
order to lift the kettle enough to make the fork-lift trolley to fi t under the kettle as described below.
• Move the Kettle to the installation site and check that it is horizontal. Place plywood strips or planks
between the fork-lift trolley and the kettle bottom (see pics above) before lifting the kettle.
• Adjust if needed using the adjustable feet on the free standing frame.
Locking nut
• Be sure to tighten the foot in the back corner of the support pillar side tight to the fl oor, otherwise it
may lift when using the mixer with heavy loads or when tipping the kettle.
• Tighten the locking nuts of the adjustable feet after the adjustment