38
|
VIKING 4G E, S
Rev. 1.0 (29.1.2020)
Installation
Installing the following kettle in a kettle group
If a kettle group is installed proceed as follows:
• Align the two kettles at the same height and move them together.
• Push the axle into the bearing. Apply grease if needed.
• Make sure the kettle is in position and the holes in the free standing frames of the kettles align.
• Fix the kettles together with four 12 mm bolts using the 19 mm spanner.
• Remove the cover plate of the left hand kettles control pillar (10 mm spanner).