MI 3309 BT DeltaPAT Instrument description
16
WARNING!
A high voltage will be present on the output of the
instrument!
WARNING!
A high insulation test voltage is present on the output of
the instrument.
Measurement is in progress.
Test result can be saved.
Connect the test lead to the S/EB test terminal.
Flex the mains cable of appliance during the test.
Test lead resistance in Earth Continuity measurement is
compensated.
Check that the device under test is switched on (to ensure
that the complete circuit is tested).
Connect the cord to be tested to the IEC test terminal.
The results of the Substitute leakage current / Substitute
leakage - P tests are calculated on base of a 110 V power
supply.
Indicate which connection in the test socket is over the
limit. (blank contact - under limit, filled contact - over limit)
RCD must be switched on.
Change position of mains cord before RCD test.
Test passed.
Test failed.
Measurement was aborted due to improper conditions
during the test.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the METREL DeltaPAT MI 3309 BT and is the answer not in the manual?

METREL DeltaPAT MI 3309 BT Specifications

General IconGeneral
BrandMETREL
ModelDeltaPAT MI 3309 BT
CategoryTest Equipment
LanguageEnglish

Related product manuals