EasyManua.ls Logo

Miele PG 8583 - Page 28

Miele PG 8583
172 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
28
Commissioning
completed
Commissioning is completed when the following message is dis-
played.
Set up successful
Confirm the message with OK.
The machine is now ready for use.
Normal plus
Temperature
Duration
h1:30
75 °C
The settings made during the commissioning process are only
adopted after a complete program has been run.
Select any program, e.g.: Drain.
Press the Start/Stop button to start the program.
After commissioning, every program starts with reactivation of the
water softener.
Fault420
If the program is canceled using Fault420, all the plumbing connec-
tions are deactivated.
Confirm the error message with OK.
Use the button to switch the machine off.
Wait approximately 10seconds before switching the machine on
again with the button.
The commissioning procedure starts again.
Perform commissioning and activate at least one plumbing connec-
tion; e.g. for cold water.

Table of Contents

Related product manuals