INSTALLATION
4-4 INSTALLATION OF THE SMARTPAK
ATTENTION
Open the Tank Outlet Valve before
installing a new SmartPak. This keeps the
tank from filling until the SmartPak is rinsed
out (A).
I
NSTALLATION
Make sure the front cover is opened.
STANDBY should be viewed on the Display
(B).
A
B
C
Remove the SmartPak from its shipping box.
Remove the protective caps on the ports of the
SmartPak and of the system.
Locate the O-rings on the ports (C). Wet them
with water. It is preferable to wet them with
ultrapure water.
- 14 -