EasyManua.ls Logo

Mitsubishi MELSEC-A series - Checklists for System Verification; 7.1 General Pre-Test Checklist

Mitsubishi MELSEC-A series
183 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7,
CHECK
USTS
/MELSEC-A
7.
CHECK
LISTS
The checklists given in associated equipment manuals should also
be
referred to.
7.1
General
Check
List
Before testing the
AD71,
check the following:
I
check
Point
I
kriptbn
ChcL
Battety
I
printed circuit board.
Check that battery
leads
are connected to
the
Parameter
IBtting
-
Check that paramerers
hw
been sat.
Check that valuas are correct.
I
I
Zeroing
I
Check
that
values are correct.
tetting
-
Check that zeroing data has
been
set.
I
I
Positioning
data
I
*
Check that
values
are
correct.
Check that positioning data has teen
set.
TaMe
7.1
General
Check
List
POINT
I
If
only one axis
(X
or
Y
axis)
is
used,
parameters
and zeroing
data must
be
written to
the
unused axis. Otherwise zeroing
will
result in error and switch on
the
XOB
(error detection)
signal.
(Data written must be within the range given
in
the User's
Manual. Parameters may
be
defautt values.)
7-1
-3
IS
INAl
66101E
!
i

Other manuals for Mitsubishi MELSEC-A series

Related product manuals