NS50 wireless network switch
User Manual
Revision C
Appendix G: Maintenance Check List
Testing RF RX path for WAC 1
3.
Stand 50M away from the IMPACT NS50 with two MST RFID
tags.
4. Open NS50 web browser interface and select the STATUS >
TAGS web page.
5. Verify that the two tags have been detected by the network switch
and check the received signal strength is within specification (Refer
to commissioning data).
Testing RF RX path for WAC 2
1.
Stand 50M away from the IMPACT NS50 with two MST RFID
tags.
2.
Open the NS50 web browser interface and select the
STATUS
>
TAGS
3.
web page.
4. Verify that the two tags have been detected by the network switch
and check the received signal strength is within specification (Refer
to commissioning data).
Open the front cover and check inside for water and dust.