EasyManua.ls Logo

MX T406 - SPEED-LINK 2 Implement Carrier

MX T406
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
30
Subject to modication
8.3 SPEED-LINK 2 implement carrier
Lift the loader to clear the implement from the ground.
Increase the operating life of the couplings by ensuring that the
implement's hydraulic functions are not pressurized: for
example, by slightly opening the grab.
Press the green and padlock buttons while moving the
monolever to the right (dumping).
The implement is now unlocked.
The locking indicator located at the back of the SPEED-LINK 2
frame is red.
Set the implement onto the ground, lightly dumping to release
the implement carrier frame from the implement.
NOTE: It is possible to use an implement with a maximum of one
DA function but not tted with the SPEED-LINK 2 connection. If
necessary, disconnect the two couplings on the rear SPEED-LINK
2 frame housing, after depressurizing the 3rd function hydraulic
circuit.

Table of Contents

Related product manuals