37
Subject to modication
13. SPEED-LINK 2 System
The SPEED-LINK 2 System (optional) on the implement carrier
frame allows implements with hydraulic and electrical functions to
be hitched and unhitched from the cab.
■
SPEED-LINK 2 equipment (loader side) (1).
■
1
SPEED-LINK 2 equipment (implement side) (2).
■
2
A red/green indicator on the back of the SPEED-LINK 2 box
indicates the locking status of the implement to the driver in the
cab.
■