Preparing for installation
Preparing to install a StorageGRID Webscale appliance entails preparing the site and obtaining all
required hardware, cables, and tools. You should also gather IP addresses and network information.
Steps
1. Preparing the site on page 12
2. Unpacking the boxes on page 13
3. Obtaining additional equipment and tools on page 14
4. Web browser requirements on page 15
5. Reviewing appliance network connections on page 16
6. Gathering installation information on page 18
Preparing the site
Before installing the appliance, you must make sure that the site and the cabinet or rack you plan to
use meet the specifications for a StorageGRID Webscale appliance.
Steps
1. Confirm that the site meets the requirements for temperature, humidity, altitude range, airflow,
heat dissipation, wiring, power, and grounding. See the NetApp Hardware Universe for more
information.
2. Confirm that your location provides 240-volt AC power.
3. Obtain a 19-inch (48.3-cm) cabinet or rack to fit shelves of this size (without cables):
Controller
Height Width Depth Maximum
weight
E2860 controller
shelf, including:
• Bezel
• 60 drives
• 2 power
canisters
• 2 controllers
• 2 fan
canisters
6.87 in.
(17.46 cm)
17.66 in.
(44.86 cm)
38.25 in.
(97.16 cm)
250 lb.
(113 kg)
SG6000-CN
controller
• Bezel
• 2 power
supplies
1.70 in.
(4.32 cm)
17.32 in.
(44.0 cm)
32.0 in.
(81.3 cm)
39 lb.
(17.7 kg)
4. Decide where you are going to install the appliance.
12