7210 SAS-M CHASSIS INSTALLATION GUIDE
Issue: 07 3HE 10089 AAAA TQZZA Edition 01 7
List of Tables
2 System Overview........................................................... 13
Table 1 7210 SAS-M Front Panel Features ........................................... 18
Table 2 7210 SAS-M 24F XFP (ETR) Front Panel Features.................. 19
Table 3 Alarm Interface Port Pin Assignments ...................................... 21
Table 4 Power Module LEDs.................................................................. 23
Table 5 Power Source Failure Detection Capability .............................. 24
Table 6 7210 SAS-M System LEDs and Buttons................................... 28
Table 7 System and Port Status LEDs................................................... 29
Table 8 Port LEDs .................................................................................. 29
Table 9 Port LED Key Descriptions ....................................................... 30
Table 10 Front Panel Buttons and Switches ............................................ 31
3 Installing the Chassis.................................................... 33
Table 11 Serial Port Pin Assignment ....................................................... 44
5 Configuring the System ................................................ 49
Table 12 Console Configuration Parameter Values ................................. 65
6 Troubleshooting ............................................................ 69
Table 13 Troubleshooting ........................................................................ 70
7 Specifications ................................................................ 73
Table 14 7210 SAS-M Specifications ......................................................74
Table 15 Compliance Standards and Certifications ................................ 75
8 Pin Assignments............................................................ 79
Table 16 10/100 Base-Tx MDI and MDI-X Port Pin Assignments............ 80
Table 17 Serial Cable Wiring .................................................................. 81
9 Alarm Pin Assignments ................................................ 83
Table 18 Alarm Interface Port Pin Assignments ...................................... 84
10 Installation Site Assessment ....................................... 87
Table 19 Checklist 1: Seasonal Influences............................................... 90
Table 20 Checklist 2: Local Risk Factors ................................................ 91
Table 21 Checklist 3: Specific Characteristics of the Installation Site ..... 92