EasyManua.ls Logo

OmniCell ERB - Page 44

Default Icon
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-34 Installation Instructions
Installation on G3 Cabinets
External Return Bin Installation and Service Guide/67-2038 Rev D © 2011 Omnicell, Inc.
3. Tilt the worksurface up, pull it forward, then lift it up and away. Set it aside.
Figure 2-91. Tilting the worksurface
Figure 2-92. Pulling the worksurface forward
Figure 2-93. Lifting the worksurface

Table of Contents

Related product manuals