Installation Instructions 2-45
Installation on G4 Cabinets
10. Replace the worksurface on the cabinet and lock it.
Figure 2-114. ERB PowerCom cable in AWS G3 upgraded to G4
Installation on G4 Cabinets
Attaching the ERB
With the exception of the AWS, installation of the ERB on G4 cabinets differs from G3 installation
only in the cabling. Perform the steps described in “Installation on G3 Cabinets” for attaching the
ERB, then use this section for the cabling. The steps for attaching the ERB to the individual
cabinets are in the following sections:
“Attaching the ERB to the OmniTT” on page 2-10
“Attaching the ERB to the OmniRx” on page 2-17
“Attaching the ERB to the Half-Cell” on page 2-19
“Attaching the ERB to the One-, Two-, and Three-Cell Cabinets” on page 2-21
This section describes the cabling procedures in the following sections:
“Cabling for the OmniTT G4” on page 2-46
“Cabling for the OmniRx G4” on page 2-54
“Cabling for the Half-Cell G4” on page 2-54
“Cabling for the One-, Two-, Three-Cell G4 Cabinets” on page 2-55
“Installing on the Anesthesia Workstation (AWS G4)” on page 2-58