EasyManua.ls Logo

Omron CJ2 CPU UNIT - Soldering; Assembling the Hood

Omron CJ2 CPU UNIT
424 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A-135
Appendices
CJ2 CPU Unit Hardware User’s Manual
A-4 Connecting to a Serial Port on the CPU Unit
App
A-4-3 Applicable Connectors and Recommended
Cables
4 Use wire strippers to remove the insulation from the end of each wire.
5 Wrap electrician's tape over the top and end of the cut sheath.
z Soldering
1 Place heat-shrinking tubes over all wires.
2 Pre-solder all wires and connector terminals.
3 Solder the wires.
4 Move the heat-shrinking tubes onto the soldered area and shrink them into place.
z Assembling the Hood
Assemble the connector hood as shown.
5 mm
Electrician's tape
1 mm
Heat-shrinking tube
(inner dia. 1.5, l = 10)
Soldering iron
Heat-shrinking tube
FG Connection
Ground plate
Aluminum foil tape
No FG Connection

Table of Contents

Related product manuals