16
System Setup Procedure Section 1-3
1-3 System Setup Procedure
The general working phases until the Safety System is operational are shown
below.
The NE1A-series Controller information required in each phase is described
in the following sections.
Refer to the following manuals for information on DeviceNet installation,
DeviceNet Safety System construction, Network Configurator operation, Pro-
gramming Device operation, and other devices used in the safety system.
1. System Design
2. Programming
4. Configuration
3. Installation and Wiring
5. User Testing
6. System Operation
Working phase Required information Details
System design System overview and example configurations
Specifications and functions
Performance
Section 1
Section 2, Section 4 to 8
Section 9
Programming Programming guidelines
Function block specifications
Section 6
Installation and wiring Node address and baud rate settings
Installation location
Device connections
Power supply wiring
Connection with I/O devices
Wiring for DeviceNet
Section 4-1
Section 3
Configuration Configuration method Section 7
User test Error classification and error history Section 10
System operation Maintenance and inspection Section 11
Item Manual name Cat. No.
Installation of DeviceNet DeviceNet User’s Manual W379
Construction of a DeviceNet
Safety System
DeviceNet Safety System Configuration Manual Z905
Network Configurator Operation
Programming Device Operation
Installation of Safety I/O Termi-
nals
DeviceNet Safety I/O Terminal Operation Man-
ual
Z904

Table of Contents

Related product manuals