EasyManua.ls Logo

Otto 100 - Unboxing Procedure

Otto 100
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OTTO 1 00 Fast Charger OMM- 000037 REV. H
30
© Clearpath Robotics Inc. 2020. All rights reserved. CLEARPATH and OTTO are trademarks of Clearpath Robotics Inc. All other product and company names listed are trademarks
or trade names of their respective companies. The information contained in these documents is the Confidential and/or Proprietary property of Clearpath Robotics Inc. and may not
be duplicated, reproduced or further disclosed without the express written approval of Clearpath Robotics Inc.
9.2 Procedure
1. Open the top of the crate.
2. Thread the Eye Nuts to the lift point locations on the charger.
See Components Overview for more detail on the lift point locations.
3. Attach a connecting link to each Eye Nut.
4. Loop a Web Sling through each connecting link and secure to the lifting device.
5. Following the lift requirements for your facility, the charger can now be lifted.
Crush
Keep a safe distance away from suspended loads as the charger presents a crushing
hazard when suspended.
6. Remove the Eye Nuts from the charger.
Caution
Failure to remove the Eye Nuts from the lifting points before returning the charger to
operation could result in damage to the charger or robots.