EasyManua.ls Logo

PALAZZANI RAGNO XTJ 43 - Page 19

PALAZZANI RAGNO XTJ 43
191 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Tel. 0039 030 6857073 - Fax 0039 030657079 info@palazzani.it - www.palazzani.it
Pag. 12OM1070_GB
With crane:
!
Attention
Is required to lower all the stabilizers for 10 cm using the FN button (like
showed in chapt. 3.11), before lifting the equipment.
using a 4-arms harness of proper capacity and lenght, fi x the hooks in the holes
on top of the stabilizers (Fig. 1.7)
lift the machine for load or unloading
sollevare l’attrezzatura per caricarela o scaricarla dall’autocarro.
Fig. 1.7
The logistic personnel must be trained persons, instructed about the loading/unloading
of the machine. Proper procedures and tools must be used for a safe lifting operation.
!
Attention
Strictly follow the indications and warning here below to grant stabi-
lity and to avoid any risk related to the machine handling.

Table of Contents