5. MAINTENANCE AND CHECK-UP
Foreword
It is recommended that the maintenance is carried out by personnel which:
 is specifi cally prepared
 knows the manual
 is authorized by the boss
 intervenes only following the producers guideline
Any intervention has to be carried out by:
 a producer authorized workshop
 expert personnel instructed by the producer.
5.1. ORDINARY MAINTENANCE - GENERAL INFORMATIONS
Advise for a correct maintenance, which guarantees long life performance:
- place the machine on plain ground
- take off the key or attach a sign saying “do not start the engine”
- disconnect the electrical supply from the machine if it is connected to the net
- before to open the engine or the hydraulic system, always clean the area
- never leave the engine or parts open longer than necessary for reparation and keep
them safe from powder and rain
- only use lubrifi cants speci ed by the producer
- take note of any recommendation by the operators, in order to check any disorder,
also to avoid more serious damage
- do not use the equipment in case it has not been repaired completely or all the safeties
are not operational
- the personnel assigned to maintenance must know this manual and must wear
protection clothes and devices
- do not allow reparations by personnel which has not been authorized by the producer
- do not use spare parts different from the original, otherwise producers responsibility
decays
- do not use this equipment for different purposes, as who does it, becomes its producer
- do not apply mods to the machine (bigger cage, longer hand extension, more powerful
engine, highest speed of work, etc.) because also in this case, who does it, becomes
its producer with all the responsibility that follow
- respect the programmed repair terms and keep track of them on the register
- keep information of any failure on the register and any reparation intervention.