Fig. 2.2
Tel. 0039 030 6857073 - Fax 0039 030657079 info@palazzani.it - www.palazzani.it
Pag. 18OM2010_GB
!
ATTENTION
Before completing the sta-
bilising manoeuvre, check
that the platform is perfectly
levelled - 2° max. slope is
admitted, as per fi g. 2.3 (the
bubble must be positioned
inside the external ring).
DANGER
Before approaching base-
ments or attic fl oors, verify
if platform weight and legs
pressure can be supported.
DANGER
Before moving the boom, ve-
rify that nobody is under the
platform working area.
For long term operations or
where it is possible, delimita-
te the area where the machi-
ne boom operats with some
chains and indications plates.
!
ATTENTION
Before using the platform, verify the correct functioning of the safety deci-
ves.
Inform the technical responsible in case of noise, vibrations or anomalous
machine behaviours.
Fig. 2.3