7 CHECK PROCEDURE (BASE UNIT)
7.1. EQUIPMENT REQUIRED
7.2. INITIAL POWER TESTS
1. Turn on the 9V supply.
2. Check for approx. 100mA current on the 9V supply line.
3. Check the 3.8V supply rail at TP91. It must be 3.8V ± 0.2V.
4. Check the 2.65V supply rail at TP95. It must be 2.65V ± 0.2V.
31
KX-TCD705RUM / KX-TCD705RUS