EasyManua.ls Logo

Polytec TMS-500 TopMap Pro.Surf - 3 First Steps; Unpacking and Inspection

Polytec TMS-500 TopMap Pro.Surf
61 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-1
3 First Steps
3 First Steps
3.1 Unpacking and Inspection
INFORMATION
Components marked with an (*) are described in separate operating
instructions.
Always pay attention to these operating instructions, too.
Unpacking
The scope of supply includes the following components:
1 A-CAB-BAS System Cabinet
1 TMS-I-500 Sensor Head
1 TMS-W-500 Data Management System consisting of an industrial PC
with mouse and keyboard
1 TMS-E-500 Controller
1 TFT monitor with monitor cable and mains cable
3 Mains cables
1 Hardlock (dongle)
1 Network cable
1 USB 3.0 cable (approved by Polytec)
1 Polytec test object
1 Motor cable
1 Control cable
1 A-STD-P550 Stand including 4 covering plates
1 A-SPK-0003 Sample Positioning Kit consisting of tip-tilt unit and spacer
ring
Assembly kit:
2 M6 x 25 Allen screws (sensor head – stand)
1 M6 x 60 Allen screw (sensor head – stand)
4 M6 x 25 Allen screws or 1/4"-20UNCx1" with washers (stand – base
plate)
4 M6 x 16 Allen screws with washers (tip-tilt unit – spacer ring or XY
positioning stage)
4 M6 x 25 Allen screws or 1/4"-20UNCx1" (spacer ring or XY positioning
stage – base plate)

Table of Contents

Related product manuals