EasyManua.ls Logo

Protec OPTIMAX 2010 NDT - Installation Procedures; Installation Requirements and Transport

Protec OPTIMAX 2010 NDT
58 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPTIMAX
2010 NDT
User Manual
516
0
-
0
-
PROTEC GmbH & Co. KG, In den Dorfwiesen 14, 71720 Oberstenfeld, Germany
14
von
58
3
Installation
WARNING!
Electrical connections should be carried out according to regulations by an
electrician.
3.1 Requirements for installation
Fresh water connection: Stop cock with 3/4" outer-thread diameter (washing machine
connection), Water pressure 2 - 10 bar (29 - 145 psi).
Drainage connection: Plastic tube - inner diameter 50 mm (2”) or larger. A ventilated syphon
which serves as odour preventor should be included in the planning. The drainage tubes
should be installed with a fall of minimum 5 %. Local Water Authorities regulations should be
complied with.
Electrical connection: Fused wall socket with earth connection according to electrical data (see
technical specifications, see 10). It is also required to install an earth-leakage switch (with 25 A /
30 mA nominal error current).

Table of Contents

Related product manuals