EasyManua.ls Logo

Provia ASPECT User Manual

Default Icon
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
INSTALLATION INSTRUCTIONS
3-LITE VINYL PATIO DOOR
END ACTIVE, UNASSEMBLED
(ASPECT
AND ENDURE
)
Contact the local recycling waste management center for waste disposal in the area. Always
check local waste requirements and carefully dispose of waste in accordance with Federal
and other regulations.
Homes built before 1978 may contain lead paint. All replacement installations must comply
with the U.S. EPAs Lead-Based Paint Renovation, Repair, and Painting Program (RRP Rule).
Read more about the RRP Rule and lead-safe work practices, on the U.S. EPAs website at:
www.epa.gov/lead
* Find QR Codes inside for additional information,
helpful installation tips, and videos.
ATTENTION!
YOU CAN ALSO SCAN
THE PACKAGING QR CODE
TO ACCESS THIS DOCUMENT
Printed instructions included
with each product will be
phased out in the
near future
Question and Answer IconNeed help?

Do you have a question about the Provia ASPECT and is the answer not in the manual?

Provia ASPECT Specifications

General IconGeneral
BrandProvia
ModelASPECT
CategoryIndoor Furnishing
LanguageEnglish

Summary

Installation Instructions Overview

Getting Started

Tools and Materials Needed

Lists the necessary tools and materials for installation.

Safety Precautions

Emphasizes the importance of using personal protective equipment during installation.

Important Notes Before Installation

Provides crucial preliminary information and checks before starting the installation process.

Installation Pack Contents Continued

Installation Pack #14 & AccuVent™ Kit

Details components for Pack #14 and the AccuVent™ Bolt Plate Kit.

Assemble Frame

Frame Assembly Isometric View

Visual guide for assembling the frame with exterior side facing up.

Prepare Opening

Install Frame

Exterior View Frame Installation

Steps for installing the frame, with an exterior view perspective.

Frame Alignment Check

Guidelines for ensuring correct frame alignment and plane.

Install Frame (Continued)

Shimming Applications for Frame

Demonstrates correct and incorrect shimming applications for frame installation.

Install Fixed Sashes

Install Fixed Sashes (Continued)

Install End Active Sash

Install Fixed Sash Screws

Install Multi-Point Handle Set

Install Active Sash Jamb Screws and Shims

Sash Operation Check

Guidance on checking and ensuring proper sash operation.

Install Keeper

Install Head Weather Strip Blocks & Insect Stops

Install Sash Stop

Install AccuVent™ Venting System Bolt Plate

Install Foot Lock

Insert Screen

Adjust Screen and Keeper

Screen Adjustment

Adjusting screen height and squareness using track screws.

Screen Latch Adjustment

Checking and adjusting the screen latch for proper operation.

Install Jamb Covers, Screw Caps & Plugs

Insulate Patio Unit

Patio Unit Insulation Process

Filling cavities with low-expanding foam for insulation.

Field Mulling

Sidelite Mulling Procedure

Aligning and securing fixed sidelites to patio units for mulling.

Stacking Plate Installation

Installing stacking plates to connect patio and sidelite frames.

Troubleshooting and Tips