Grandview® G800EC Gas Fireplace | 39
installation
Total Material
Maximum Depth: 1
1/4”
Finishing Material
Backing Material (Drywall etc.)
*Distance to
combustible material
varies with install*
OUTSIDE FINISH
Finishing Material
Backing Material (Drywall etc.)
Flush Finishing Material
CLEAN FRONT
3. Slot the Stando Deector onto the back screws, then secure the with a screw through the
remaining front hole on each ange.
1. Screw one screw into the rear hole on each Side Nailing Flange.
2. Install the Top Nailing Flange with 4 screws.
Top Nailing
Flange
Stando Deector
Nailing Flange Installation: