38 | Grandview® G800EC Gas Fireplace
installation
Unit Assembly Prior to Installation:
Aer the framing has been built, the nail-
ing Flanges will need to be set depending
on the depth of nishing material being
used. Up to 1¼” total material thickness
can be used, including the backing mate-
rial. e depth of nishing material can be
adjusted in ¼” increments.
1¼”
Finishing
Material
Depth
Flush
Setting
1. Determine the required depth set-
ting for the materials being used.
2. Once the setting has been chosen,
install the Le and Right Nail-
ing Flanges with 2 screws on each
Flange.
1”
¾”
½”
¼”
Front of Fireplace
Nailing Flange Parts
Top Nailing Flange
Stando Deector
Le Nailing Flange
Right Nailing Flange