REYMSA COOLING TOWERS, INC.
www.reymsa.com
The
All-Fiberglass
Cooling Towers
11
HORIZONTAL FLANGES
UPPER SECTION VERTICAL
FLANGES
Figure A-25: Upper Section 1 & 2 for quadruple fan tower on plane
K. Now with the two upper sections together, proceeds to bolt down and secure horizontal anges with the
stainless steel nut and bolts sets supplied by REYMSA. See Figure A-25.
Installation
L. Identify each fan duct, they are labeled with a number on the inside of the lower edge. For a correct
installation, this number must match the number on the corresponding receiving ange. Place fan duct 1
on the corresponding receiving ange on top of section 1 of the tower (see Figure A-26); make sure the
bolt holes and the marks inside the fan duct and receiving ange are aligned (Figure A-27). Secure it
with the stainless steel nut and bolt sets supplied by REYMSA. There are two different types of receiving
anges, either one has its own assembly pieces (see Table A-4 to verify the Type of receiving ange of
your tower).