REYMSA COOLING TOWERS, INC.
www.reymsa.com
52
▪ Purge
Purging is done to remove circulating water high in dissolved solids concentration. The purge connection is
NPT threaded and must have a valve (supplied by others).
▪ Drain
The drain is used to remove all the circulating water for Tower maintenance and cleaning. The drain
connection is NPT and must have a valve (supplied by others).
▪ Equalization
The equalization connection is used to maintain equal water levels when the system consists on more than one
basin (see Figure A-120). REYMSA recommends installing a valve (supplied by others) at the Equalization
line to regulate flow and allow Tower isolation. Also see section “A.8 EQUALIZER LINE INSTALLATION”.
A.11.3 WIRING
All electrical work should be performed by qualified personnel and in accordance to applicable electrical
codes, best practices and safety standards. All wiring must conform to Federal, State and Local Codes.
Electrical wiring must be handled ONLY by qualified personnel. Failure
to do so may result in severe personal injury or property damage.
CAUTION
Figure A-120: Example of equalization line
Installation