LED R&D Lab(VD)
100
Product reassembly method – 5) Sub screen seam control
□ Seam control between sub screens (Y)
Insert a 3 mm hexagonal wrench into the screw
Counterclockwise rotation: Screen downward movement
Clockwise rotation: Screen upward movement
After removing BEZEL, you can adjust
the height difference, tilt between
SCREENs with SCREEN top SCREW.
Ladders are required in some cases
when adjusting the top