Install the ASSY BRACKET P-FRONT by hanging it on the ASSY BRACKET P-FRAME.
- After installing 1st and 2nd in the middle, install them in order of 3rd and 4th.
※ Be sure to read the precautions 1, 2, and 3 on the previous page and install.
- Be sure to comply with the installation order
- Since it is installed by hanging, it is raised and installed at an angle.
- The numbers L1, L2, R1, and R2 of each cabinet are arranged as shown in Figure 1.
1
2
3
4
L1
L2
R1
R2
FRONT module end baseline
4. FRAME installation and cable connection
FRONT module end baseline
Fig.1 Install position 1 first