EasyManua.ls Logo

Samsung AC Series - Checking Installation Operation

Samsung AC Series
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
41
Check the operation of each ASSY BRACKET P-FRONT installation.
- Be sure to read the following precautions when lifting the cabinet for cable connection.
- If the two cabinets are lifted completely attached, there is a possibility of module damage due to collision between modules. (Fig1.)
- Be sure to lift it with a gap of more than 5mm left and right.
- If the module is not broken and simply deviated, Appendix1. Reassemble by referring to module disassembly/assembly method.
CABINET 1 CABINET 2
Fig1. Module collision between cabinets
Module disassembly due to
collision between cabinets
Fig2. Lift after making GAP
More than 5mm
4. FRAME installation and cable connection

Table of Contents

Other manuals for Samsung AC Series

Related product manuals