EasyManua.ls Logo

Samsung AC Series - 4. FRAME installation and cable connection

Samsung AC Series
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
35
Connecting the cable in the frame section below (130”)
BN39-02743B(OCM) to Main OCM1, spread it over the L1 Frame fixed injection, and hang it.
BN39-02743A(OCM) to Main OCM2, spread it over the L2 Frame fixed injection, and hang it.
BN39-02776A(OCM) to Main OCM3, spread it over the R1 Frame fixed injection, and hang it.
BN39-02776A(OCM) to Main OCM4, spread it over the R2 Frame fixed injection, and hang it.
※ Mark the OCM cable connection location as SILK at the Main b’d OCM connector location.
4. FRAME installation and cable connection
BN39-02743B
BN39-02743A
BN39-02776A
BN39-02776A
Fig.1 Main b’d Silk
Cable 고정용
고리 사출물
LEFT-FRAME
RIGHT-FRAME
L1
L2
R1
R2
3
4
5
6
BN39-
02743B
BN39-
02743A
BN39-
02776A
BN39-
02776A
Injection hook for
Cable fixing

Table of Contents

Other manuals for Samsung AC Series

Related product manuals