LED R&D Lab(VD)
35
⑧ Connecting the cable in the frame section below (130”)
③ BN39-02743B(OCM) to Main OCM1, spread it over the L1 Frame fixed injection, and hang it.
④ BN39-02743A(OCM) to Main OCM2, spread it over the L2 Frame fixed injection, and hang it.
⑤ BN39-02776A(OCM) to Main OCM3, spread it over the R1 Frame fixed injection, and hang it.
⑥ BN39-02776A(OCM) to Main OCM4, spread it over the R2 Frame fixed injection, and hang it.
※ Mark the OCM cable connection location as SILK at the Main b’d OCM connector location.
4. FRAME installation and cable connection
BN39-02743B
BN39-02743A
BN39-02776A
BN39-02776A
Fig.1 Main b’d Silk
Cable 고정용
고리 사출물
LEFT-FRAME
RIGHT-FRAME
L1
L2
R1
R2
3
4
5
6
③BN39-
02743B
④BN39-
02743A
⑤BN39-
02776A
⑥BN39-
02776A
Injection hook for
Cable fixing