EasyManua.ls Logo

Samsung AC Series - 4. FRAME installation and cable connection

Samsung AC Series
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
42
Check the operation of each ASSY BRACKET P-FRONT installation.
- Connect the power of the SET power cord to check whether the entire LED is damaged or not and check the output.
4. FRAME installation and cable connection
Fig.1 Check the operation after installing one
Fig.2 Check the operation after installing two
Fig.3 Check operation after installing three
Fig.4 Check operation after installing four

Table of Contents

Other manuals for Samsung AC Series

Related product manuals