EasyManua.ls Logo

Samsung AC Series - Pre-prepare Before Installation

Samsung AC Series
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
16
2. Preparation of Cabinet installation
Pre-prepare before installation
To remove SET packaging, a ceiling space 600mm higher than the minimum SET packaging is required.
If there is not enough space, disassemble the SET packaging in the possible space
and move the cabinet to the installation space.
Fig.1 Packing disassembly space
SET packing
Ceiling wall
1982mm
600 +@ mm
PALLET

Table of Contents

Other manuals for Samsung AC Series

Related product manuals