46  Operating Instructions Cubis
®
 MCA
 Installation
5.5  Connecting the Ethernet Cable
Material: 1 Ethernet cable
1 soft support base
Requirements
 − The weighing pan and the associated components have not been set up.
 − For a device with an analytical draft shield or flat glass draft shield: 
Theside panels and upper panel have not been fitted.
Procedure
 t If the display and control unit is attached to the weighing module 
orelectronics module: Turn over the device and place on a soft surface.
 t If the display and control unit is removed from the weighing module 
orelectronics module: Turn over the display and control unit and place 
onasoft surface.
 t Remove the cover (3) of the Ethernet connection socket on the 
underside of the display and control unit.
 t Plug the Ethernet cable into the Ethernet connection socket.
 t If the display and control unit is attached to the weighing module or 
electronics module: Place the Ethernet cable into the cable channel (1) 
and turn the cable lock (2) using the Ethernet cable.
 t If the display and control unit is removed from the weighing module 
orelectronics module: Place the Ethernet cable in the cable channel.
 t Place the device back on the device base on a level surface.
5.6  Preparing Below-balance Weighing
The device can be configured for below-balance weighing. Samples can 
besuspended for weighing using below-balance weighing, e.g. samples, 
which do not fit on the weighing pan. 
For below-balance weighing, the hook must be installed in the device base 
and the device set up on a weighing table with recess. 
In legal metrology: 
 − The below-balance weighing equipment may not be used. 
 − The cover of the below-balance weighing equipment may 
notbeopened.
Material: 1 soft support base
1 draft protection shield
1 weighing table with recess
2 13