EasyManua.ls Logo

SDMO R44C3 - Page 183

SDMO R44C3
204 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
2010.10 / i
LeRoY-SoMeR
4.6.1 - Tools required
To fully dismantle the machine, we recommend using the tools
listed below:
- 1 ratchet spanner + extension
- 1 torque wrench
- 1 set of at spanners: 7 mm, 8 mm, 10 mm, 12 mm
- 1 socket set: 8 mm, 10 mm, 13 mm, 16 mm, 18 mm, 21 mm,
22 mm, 24 mm
- 1 size 5 Allen key (eg. Facom: ET5)
- 1 size 6 Allen key (eg. Facom: ET6)
- 1 size 10 Allen key (eg. Facom: ET10)
- 1 size 14 Allen key (eg. Facom: ET14)
- 1 T20 and T30 TORX bit
- 1 puller (eg. Facom: U35)
- 1 puller (eg. Facom: U32/350).
4.6.2 - Screw tightening torque
IDENTIFICATION screw Ø Torque N.m
Field terminal block screw M4 4 N.m
Field screw M6 10 N.m
Diode bridge/RP M6 5 N.m
Diode nut M5 4 N.m
43.2 tie rod M12 57 N.m
44.2 tie rod M14 90 N.m
Earth screw M8 26 N.m
43.2 disc/shaft screw M12 110 N.m
44.2 disc/shaft screw M16 250 N.m
44.2 turbine screw M6 5 N.m
Grille screws M6 5 N.m
Cover screws M6 5 N.m
Terminal block nut M10 20 N.m
4.6.3 - Access to connections and the
regulation system
The terminals are accessed directly by removing the terminal
box lid [48].
To access the AVR adjustment potentiometers, the side plate
[367] should be removed.
4.6.4 - Accessing, checking and
replacing diodes
4.6.4.1 - Dismantling
- Remove the air intake grille [51]
- Remove the surge suppressor [347]
- Disconnect the 6 diodes using an ohmmeter or a battery lamp
(see section 4.5.2)
4.6.4.2 - Reassembly
- Replace the bridges, respecting the polarity (see section 4.5.1)
- Replace the surge suppressor [347]
- Ret the air intake grille [51]
- Replace the terminal box lid [48]
4.6.5 - Replacing the NDE bearing on single-
bearing machines
4.6.5.1 - Dismantling
- Remove the terminal box lid [48]
- Remove the air intake grille [51]
- Unscrew the xing clamps on the power output cables,
remove the connector from the exciter and the R 791 module.
- Remove the 4 nuts on the tie rods
- Remove the NDE shield [36] using a puller: eg. U.32 - 350
(FACOM)
- Remove the ball bearing [70] using a screw puller
4.6.5.2 - Reassembly
- Heat the inner slipring of a new bearing by induction or in a
drying oven at 80 °C (do not use an oil-bath) and t it to the
machine.
- Place the preloading wavy washer [79] in the shield and t a
new O ring seal [349].
Ret the NDE shield and pass the bundle of wires between the
top bars of the shield.
- Ret the xing clamps on the cables, the R 791 module and
the exciter connector.
- Ret the air intake grille [51].
- Replace the terminal box lid [48].
NDE shield
Rotor
Screw rod
4.6.6 - Replacing the bearings on two-bearing
machines
4.6.6.1 - Dismantling
- Uncouple the alternator from the prime mover.
- Remove the 8 assembly screws.
- Remove the DE shield [30].
- Remove the NDE shield (see section 4.6.5.1)
- Remove both ball bearings [60] and [70] using a puller with a
central screw.
4.6.6.2 - Reassembly
- Heat the new bearings by induction or in a drying oven at 80°C
(do not use an oil-bath) and t them to the machine.
- Check that both the preloading wavy washer [79] and the new
O ring seal [349] have been tted on the NDE shield [36].
Ret the NDE shield and pass the bundle of wires between the
top bars of the shield.
- Ret the DE shield [30] and tighten the 4 xing screws.
- Check that the machine assembly is correctly mounted and
that all screws are tightened.
INSTALLATION AND MAINTENANCE
LSA 43.2 / 44.2 - 4-poLe
ALTeRNAToRS
3434 en -
181/202

Table of Contents

Related product manuals