EasyManua.ls Logo

Siemens 6ES7153-1AA03-0XB0 - Brief instructions on commissioning

Siemens 6ES7153-1AA03-0XB0
271 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ET 200M
22 Operating Instructions, 04/2022, EWA-4NEB7806006-09
Brief instructions on commissioning
2
2.1 Commissioning on PROFIBUS DP
2.1.1 Introduction
Introduction
The following simple example shows you how to commission the ET 200M step by step.
Installing and wiring the ET 200M
Configuring with STEP 7
Linking to the User Program
Switching on the ET 200M
Evaluating the diagnostics:
Encoder supply short circuit after M on the digital input module
Short circuit after L+ on the digital output module
Requirements
You have configured an S7 station, consisting of a power supply module and a DP master
(e.g. CPU 315-2 DP). For this example a CPU 315-2 DP is used as the DP master. You can of
course use any other DP master (standard IEC 61784-1:2002 Ed1 CP 3/1).
The current STEP 7 version is fully installed on your programming device (PD). There may
be restrictions if using older versions of STEP 7. You have experience with STEP 7.
The PD is connected to the DP master.

Table of Contents

Related product manuals