EasyManua.ls Logo

Siemens 6ES7153-1AA03-0XB0 - Mounting the ET 200 M

Siemens 6ES7153-1AA03-0XB0
271 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Brief instructions on commissioning
2.1 Commissioning on PROFIBUS DP
ET 200M
24 Operating Instructions, 04/2022, EWA-4NEB7806006-09
Number
Item
Order number (Siemens)
1
Tool for crimping wire-end ferrules
commonly available
Approx.
2 m
Stranded wire with 1 mm
2
cross section with
appropriate wire end ferrules, type A, length 6 mm
commonly available
2
one-pin on button
commonly available
1
24 V indicator lamp
commonly available
2.1.2 Mounting the ET 200M
Procedure
1. Mount the rail on a firm base so that there is at least 40 mm clearance above and below the
rail.
2. Starting from the left side, mount the individual modules on the rail (plug in the bus
connectors (not for PS 307 and the last module) engage swing in screw down).
Observe the following sequence:
Power supply PS 307
Interface module IM 153-2
DI module SM 321
DO module SM 322
3. Set PROFIBUS address 3 on the interface module IM 153-2.
Figure 2-2 Setting PROFIBUS address 3

Table of Contents

Related product manuals