9
08/2005 Program Management
9.2 Mana
in
ro
rams with Sho
Turn on NCU
HMI Embedded
9
♥ Siemens AG, 2005. All rights reserved
SINUMERIK 840D sl Operation/Programming ShopTurn (BAT) – 08/2005 Edition 9-385
îš¾ Press the "OK" softkey.
The tool/zero point data will be set up in the same directory in which
the selected program is stored.
If a tool/zero point file with the specified name already exists, this will
now be overwritten with the new data.
If an MPF program and an INI file of the same name are located in a
directory, the INI file will be automatically started when the MPF
program is selected. In this way, unwanted tool data can be changed.
Importing data
Continue
>
îš¾ Open the Program Manager.
îš¾ Place the cursor on the tool/zero point data backup that you wish
to re-import.
Execute
-or-
îš¾ Select the "Execute" softkey or the "Input" key.
The window "Read in backup data" is opened.
îš¾ Select the data (tool offset data, magazine loading data, zero
point data, basic work offsets) that you wish to read in.
îš¾ Press the "OK" softkey.
The data are read in.
Depending on which data you have selected, ShopTurn behaves as
follows:
All tool offset data
All data in the tool management system is deleted first. The backup
data is then read in.
All tool offset data used in the program
If at least one of the tools to be read in already exists in the tool
management system, you can choose between the following options.
Replace all
îš¾ Select the "Replace all" softkey to import all tool data. Any existing
tools will now be overwritten without a warning prompt.
-or-
Replace
none
îš¾ Select the "Replace none" softkey if you want to cancel the data
import.
-or-